If you have P6
Import the .xer file, open the project, set up a layout with the columns and timescale you want, and print it to a PDF printer. That works, but it adds the project to your P6 database and needs a P6 license.
If you don't have P6
- Drop the .xer file into the XER Viewer. It is read in your browser and never uploaded.
- Pick the project if the file holds several. Check the Gantt chart on screen; viewing is free.
- Leave Critical (total float ≤ 0) ticked if you want the critical activities in red on the PDF, or untick it for plain bars.
- Click PDF Gantt. Exports are $19 once for every schedule you open, or $7 for 24 hours.
What is on the pages
- Landscape Letter pages, about 30 rows to a page, numbered "Page 1 of N".
- A header on every page with the project name, its ID, the data date, the project start and finish and the activity count.
- Columns: Activity ID, Activity Name (indented under its WBS), Original Duration, Start, Finish and Total Float.
- The chart: a bar for every activity with its percent complete filled in, WBS summary bars, diamonds for milestones with their dates, and a dashed line at the data date. The timescale fits the whole project across the page width.
Every activity is printed in WBS order, even if you collapsed parts of the tree or searched on screen.
Good to know
- The pages are drawn as images, so the PDF looks the same in any reader and prints cleanly, but you can't select or search the text in it. For text you can work with, use the Excel or CSV export.
- Relationship lines aren't drawn between the bars. The links are in the Predecessors column of the activity table and on the Relationships sheet of the Excel export.
- The dates are the ones in the file, as of its data date. The viewer doesn't recalculate the schedule.
Try it first
Look at the Gantt chart on screen for free before you buy. If you also want the data, the Excel export of the first 20 activities is free, so you can check your schedule reads correctly before paying.