The resource list, free
- Drop the .mpp, .mpx or Project .xml file into the MPP Viewer.
- Click the Resources tab above the chart.
You get one row per resource with its ID, name, type (work, material or cost), initials, group, max units and the total work assigned to it in hours. A resource with max units of 50% is planned at half time; a total far above the others is usually the person the schedule leans on.
Which tasks each resource has
Switch to the Task table tab. The Resource Names column shows who is on each task, next to its dates and % complete. To follow one person through the plan, use your browser's Find (Ctrl+F, or Cmd+F on a Mac) and type their name.
The full assignment detail
The viewer's Excel export ($9 once, or $7 for 24 hours) adds two sheets next to the tasks:
- Resources: ID, name, type, initials, group, email, max units, standard rate, work and cost.
- Assignments: one row per task and resource pair, with the task ID and name, the resource, units, work, and the assignment's own start and finish.
Filters are on, so you can pick one person on the Assignments sheet and sort by start to see their work in order, or sort the Resources sheet by work to find who is overloaded. Want to check before paying? On a plan with more than 20 tasks, click Excel and download the free sample of the first 20 tasks, with all three sheets.
If the Resources tab is empty
Some plans are scheduled without resources: the tasks have dates but nobody is assigned. Then the viewer says the project has no resources, and the Resource Names column is blank. That's how the file was saved, so ask the plan owner whether staffing is tracked somewhere else.
Free on any computer
Viewing works on Windows, Mac and Chromebook with nothing to install. The file is read on our server and deleted as soon as the plan comes back. It's a viewer, so you can't reassign work and save a new .mpp; that change goes back to whoever owns the schedule.